4 May 2015

Final week - Moving in

I have compared building your own home in the past to having a baby, the two processes have many things in common.  No more so than the final couple of weeks before you move in.  It's like being overdue by a couple of weeks.   You expected that baby to be out 14 days ago and now you are thoroughly fed up.  You are exhausted, uncomfortable, emotional and stressed.  All you want is to get that baby (or house) out and get on with the rest of your life!

We had hoped to move the final week of August but in the end that was put back to early September which meant that in the meantime the children had a lengthy commute to their new school.

My demeanour utterly changed.  My tolerance was zero, my goodwill disappeared.  It ended up being a ridiculously tight schedule of work with zero tolerance for any mistakes/delays.  The cowls were nowhere to be seen so work was focussed internally.  The painters arrived and spent a week painting the house, including the weekend.  As finances were getting ever tighter a number of jobs now fell at my feet.  Seal the concrete floors, finish the Dinesen window boards & staircase, and stain and varnish all the birch ply joinery.  The bathrooms and bedrooms were pretty ready.  The kitchen was installed.  What more did we need?  Come on already...

The scaffolding around the door was moved to allow the removal guys to get into the building.



This picture was taken a few weeks after we moved in, there were no slates when we moved in, but you get the idea - scaffolding everywhere, a ply sheet for an entrance!

In we came.






At last we were living in our new home.




2 May 2015

The Cowls

The cowls, the cowls, the cowls!  What a palaver.  This became the black hole of time and energy for the project.  We worked on this part of the build for months!!!  Had we known then what we know now, work on this should have begun months earlier - the beauty of hindsight!







Dimitri's favourite part of the original design were the metal window cowls. Early on in the design process we reviewed the designs with and without them and they gave the building such character. Not only do they look fantastic but they play a functional role in solar shading during the summer months when the sun is high.  It is critically important to prevent overheating in our highly insulated and airtight home. 




Without the cowls - an early design



Easy, we all thought, we'll make them from inexpensive Galvanised Steel sheet, fix them to the walls and then slate on top.  We were SO wrong!

As soon as the metal manufacturers were drafted in to consult on designs the issues became all too clear.  Galvanising is done normally by hot dipping steel in a zinc bath.  The zinc coating then protects the steel from rust, and even if the zinc coating is scratched then the remaining zinc will still prevent rusting.

The design of the cowls meant that sheets of metal would be the most straightforward thing to use, and cost effective.  However sheet metal is the worst material to hot-dip.  It has a high surface area to mass ratio and the heat related expansion during hot-dips results in warps, twists and buckles.  Oh no!

But luckily we discovered that it is possible to galvanise using another method where the zinc is sprayed on after the metal has been fabricated to the shape required.  There are obviously considerably higher costs associated with this - as always! 

Steel is very heavy, so aluminium was also considered as it is 1/3 of the density.  But aluminium is more expensive.  Believe me when I say this has not been easy and it wasn't inexpensive at all.  

It took weeks and weeks to get through all the decisions and get the final drawing package produced as all the windows had to be surveyed on site, checked, and checked again.  Then when we finally had the package we sent them out for prices and it took at least another month before we were finally in a position to be able to place the order.  The fabricators also had their own drawings to produce which then had to be checked by Team Luxton.  A complete headache for everyone.







I was promised a 3 week fabrication time and unfortunately 4 weeks later the company had still not obtained the raw sheet metal.  It would be another few weeks before we took delivery and then it was found that a couple of items were incorrect and so we had to wait for these to be collected and then re-fabricated...are you starting to feel the pain yet?  Drivers were ill, people were on holiday, workshops were busy, etc., etc.



Cowl parts waiting to be installed 



This created a real traffic jam

- without the cowls the slates couldn't go on
- the scaffolding couldn't be taken down until the slates were on
- all rainwater goods, hoppers and downpipes couldn't be fixed until the slates were on
- the parapet cover couldn't be installed until the slating was completed

It also almost left us homeless as we had given notice to our old home to move out in the last weeks of August, but with scaffolding surrounding the house we wouldn't be able to get the removals firm to enter the building!  In the end Andrew and I made a strategic decision to adjust the scaffolding and focus attention internally so that we could move in regardless, they would move outside at a later date when we knew everything needed would be on site.  Enough with the delays!








Cool after-school viewing better than TV!


We decided to leave the metal work raw and undressed, including the weld marks.  I love the honesty and character - very Wabi-Sabi!


Our scaffolding costs went through the roof as it had to be hired for another 6 months being no use in the meantime.  Had we known the extent of the delays it would have been cheaper to take the scaffolding down and re-erect at a later date.  

Once the metal work was mounted around the windows we had planned to get a welder to come and weld the separate pieces together.  Another new trade about which I know nothing.  My builder, Andrew, and my Structural Engineer, Charles, both expressed concerns about the wisdom of welding so close to our beautiful and expensive triple glazed windows.  These are powder coated aluminium and we don't want their coating to run off nor the glass to melt.  Another week or two of investigation and we solved the issue by only welding the outer edges.  








God bless my ever patient slaters, P.L. Allard, they had originally been organised for March, then delayed to May, then told that they would be able to start mid-August and finally got on site in September!







What can I say? Condensed like this it seems like a small hiccup but it ground everyone down and had negative consequences for the relationships and morale of everyone involved.  We got there in the end though! 






3 Jan 2014

Week 4 - Propping the slip and best foot forward


So Monday afternoon saw Charles, our structural engineer, and I, join Andrew on site to have a look at the slip and discuss next steps.  Charles was happy that we could prop the area and that would allow work to continue safely.  Andrew was keen that our solution be in timber as that's what he knows best and it can also be reused later in the project - sustainability!








So by Tuesday afternoon we had the very lovely hand drawn drawings (it makes me want all my technical drawings done by hand now!) and the delay was over.








8 Dec 2013

Week 3 - Soakaway, hub & more rocks

What a week.  Well, we are really getting into the swing of this housebuilding thing and the honeymoon period is well and truly over!  Why, oh why, does the most unpredictable and therefore most costly and stressful part come first?!?


But let's start at the beginning of the week which on-site was going really well. The soakaway was completed - a large deep hole filled with crates and stone which allows rainwater to soak back into the ground instead of running off.


The soakaway.





Look concrete - something is being built!

17 Oct 2013

Wait...wait...and wait some more.

Life has been a rollercoaster for the past few weeks, and guess what - we have still not started on site!

The groundworks package was prepared and given to the three contractors I had previously got details of.  One immediately got discounted as he was too busy.  The other two have been considering the package over the past couple of weeks.  One walked away today as he has contradictory ideas to the work which is being proposed.  So we are left with only one quote! Hardly ideal, doesn't everyone say you need at least 3 different prices? But do we keep going when it's going to be at least another fortnight before anyone can give us another price?


This bank needs to be cut back, it's about 3m high.


It's really tricky to know what's what when different people are telling you different things.  When everyone explains they sound equally reasonable.  But in the end I have to trust my architectural designers and structural engineer and believe that they know best for my situation.



We have to dig a trench down the hill, beside the hedge,
for the main drain and electricity connection.


Another pressure is that our builder was asked to be ready to start on site towards the end of Sept.  We are now nearly a month on and he is waiting to start work as soon as he can.  There are reasons for the delays; we had to go back to Planning for an amendment (five weeks) and a personal matter delayed the preparation of the groundworks package.  But regardless, we all want to get on with it.

Some good news is that hopefully we have resolved a stress-inducing matter relating to one of our boundaries.  As the Land Registry map differed to the fencing on site our neighbour was questioning whether they were entitled to some of our land.  It has taken me two months of research to establish that the boundaries should remain in their current location.  Two months of low level, bubbling stress and effort to essentially maintain status quo.  But I'm delighted that it seems to be finished with amicably.

These past few weeks have taught me that I need to become much more laid back if i'm going to survive this build emotionally intact.  I've been a little manic, truth be told.  Anyone got any meditation or calming techniques they can share?  Might have to hit Thermae Bath Spa!