12 Feb 2015

2nd Fix

With the floor installed and then protected with a floor covering re-cycled from another site,  it meant that 2nd fix could begin in earnest!  

2nd fix is when all the final finishes are installed, everything above the plaster layer; switches and light fittings, sanitary ware, flooring, paint, tiling etc. etc. It's busy, busy, busy and seems to go on forever!

The house was filled with trades - plumbers, electricians, tiler and kitchen fitter.  Andrew and Paul focused on making all the internal joinery. 


Stairs...!



There is a lot of internal joinery as most walls are actually bookcases.


I had designed these door handles so we experimented with where to position them.



Interestingly rather than taking turns to be on site everyone seemed to prefer to be there while the other trades were there too.  There was a LOT of banter - all good, so good in fact neighbouring builders were known to pop-in for lunch.  Not sure how to feel about that, I'm choosing to believe it's because we've got such great group of people who are working hard in a really productive and creative atmosphere and who wouldn't want to be part of that group...!? 



The basin and sink are from Bathstore, the tap and waste from Crosswater.  For bathroom info see here



The elegant Bauhaus Edge Towel Rail in Anthracite.



Simpsons Frameless Ten Bath Screen and Crosswater Shower is installed. 



It goes without saying that it has not been all plain sailing.  But mostly it has been fine.  This has also meant that I have needed to get to site a lot more often as lots of decisions still have to made and things checked.  Mistakes have been made and most people are on day rates so ultimately those mistakes hit my pocket! It becomes a case of coming to terms to living with the mistakes, because to redo would cost too much and take too much time.  Must remember to channel Wabi-Sabi (the Japanese philosophy of embracing imperfection) and remember that everyone is human and everyone makes mistakes, including myself!  






The plant room comes to life!  Our gas boiler is installed.  As we have minimal space heating demands it doesn't make sense for us to go for a more eco alternative here as the payback would take exponentially longer for us.  Our largest demand will be hot water and the plan is to eventually install photovoltaic panels to address this demand.



We have a boiler!


Charlie, the plumber, was bemused by my excitement at unwrapping the taps - it was like Christmas!


This is the point in the project where it was always going to be an issue about being a mother to 3 young children and building a house at the same time.  Dimitri always said that he would go on site at this stage of the build to supervise however it rapidly became clear that interiors and detailing was just not something that he was confident with.  So we've done the best we can and hopefully the majority is good and we will soon not notice those small issues...! The problem is that I've very tuned into detail and notice things without even wanting to and so even though no one else notices I do and they BUG me everytime I see them!














Andrew created oak cases to house T5 light fittings, then we figured out how it would work, more on lighting here.







These T5s will be hidden by a false ceiling panel so the lights should just give a glow at the edges.

Just one foot in front of the other...

30 Jun 2014

1st fix begins!

Site is a crazy place at the moment with a huge amount of people and activity as our plumbers, Cotswold Green Energy,






 and electricians, Aspey Electrical, commence 1st fix. 







For novices, like me, this is all the wires and pipes that are hidden behind the plaster walls- the skeleton of the building. And there is a lot of work to be done!






There is lots of pressure on everyone as we have to get this all correct.  As it will be behind plaster we can't change things later (you can of course but at a huge amount of expense and time). 







Do you remember those lovely service plans that I did with Charlie a month or two ago? I thought that it had all been taken care of.  It turns out those were just the starting points. As a result I've spent a lot of time on site for the last couple of weeks.








Plumbing has been relatively straightforward as I had spent hours on detailing the bathrooms (see here), so I had all the specifications and details at hand.  I'd also made design choices which made the plumbing in these areas simpler e.g. a ply wall and shelf will conceal the pipework and cistern, rather than chasing them into the blockwork.  Charlie from Cotswold Green Energy has designed our heating system so I didn't need to get very involved in that side of things.








On the electrical front, plugs and switches have been relatively straightforward. There was only one plug position that had to be changed, Mat was extremely thorough and so everything else was really well positioned.  Lighting however has been a bit of a horror (see Lighting Re-re-design).  I was not prepared!






Making all these decisions and spending a lot of time in the house has meant that I am actively imagining living in spaces as they start to take shape.  Experiencing the spaces is so different from seeing them on plan.  Ideas inevitably change, but things also clarify and the simple solution is obvious.  This is what house-builders are strictly advised not to do, change things, due to the resultant uplift in costs but as we are not on a fixed price contract I do have more flexibility.  I'm just doing what everyone who has built before has advised me - "trust your instincts", and it's OK.  We're getting there!